Page 32 - dự án PREVIEW
P. 32

32          LIST OF PROJECTS ATTRACTING INVESTMENT




















                                                                                                    Source: Collection
          17 17    CONSTRUCTION OF INTER-SECTORAL CHECKPOINT
                   CONSTRUCTION OF INTER-SECTORAL CHECKPOINT
                   OF BAC LUAN BRIDGE III IN MONG CAI CITY
                   OF BAC LUAN BRIDGE III IN MONG CAI CITY

                      Hai Hoa Ward, Mong Cai City









        Ha Noi city center  300 km  Noi Bai Airport 300 km  Bac Luan I gate  03 km  Tuan Chau port 180 km  Ha Long Station 165 km  Highway
        Ha Long city center 160 km  Cac Bi Airport  205 km  Bac Luan II gate  04 km  Ha Long port  160 km  Van Đon - Mong Cai 750 m
        Cam Pha city center 03 km  Van Don Airport 130 km






             Objective: To meet operational requirements immediately after Bac      Scale/Capacity:
             Luan  III  bridge  is completed  and put into operation;  to improve the
             capacity to inspect and control the import and export of goods and      - Area: 77.46 ha, including:
             services.                                                         +  The working  office of the
                                                                               inter-sectoral inspection station.
                                                                               +  Technical  infrastructure system:
                                                                               leveling, transportation, water supply
                                                                               and drainage, etc.
                                                                               Expected total investment:  VND
                                                                               400 billion (about USD 18 million)
                                                                               Investment form: PPP
                                                                               Current land-use status:  Swamp
                                                                               land for  aquaculture and mangrove
                                                                               forest land
                                                                               Project efficiency:  Ensure  border
                                                                               security  and  order,  consistent
                                                                               development    and     technical
                                                                               infrastructure in border areas.
   27   28   29   30   31   32   33   34   35   36   37