32 LIST OF PROJECTS ATTRACTING INVESTMENT
Source: Collection
17 17 CONSTRUCTION OF INTER-SECTORAL CHECKPOINT
CONSTRUCTION OF INTER-SECTORAL CHECKPOINT
OF BAC LUAN BRIDGE III IN MONG CAI CITY
OF BAC LUAN BRIDGE III IN MONG CAI CITY
Hai Hoa Ward, Mong Cai City
Ha Noi city center 300 km Noi Bai Airport 300 km Bac Luan I gate 03 km Tuan Chau port 180 km Ha Long Station 165 km Highway
Ha Long city center 160 km Cac Bi Airport 205 km Bac Luan II gate 04 km Ha Long port 160 km Van Đon - Mong Cai 750 m
Cam Pha city center 03 km Van Don Airport 130 km
Objective: To meet operational requirements immediately after Bac Scale/Capacity:
Luan III bridge is completed and put into operation; to improve the
capacity to inspect and control the import and export of goods and - Area: 77.46 ha, including:
services. + The working office of the
inter-sectoral inspection station.
+ Technical infrastructure system:
leveling, transportation, water supply
and drainage, etc.
Expected total investment: VND
400 billion (about USD 18 million)
Investment form: PPP
Current land-use status: Swamp
land for aquaculture and mangrove
forest land
Project efficiency: Ensure border
security and order, consistent
development and technical
infrastructure in border areas.