Page 15 - QUANGNINH ECONOMIC ZONE AUTHORITY
P. 15

HAI YEN






           Industrial Park




           I. General Information:
           - Location: Hai Yen ward, Mong Cai city, Quang
           Ninh province.  Within Mong Cai Border Gate
           Economic Zone
           - Infrastructure developer: Viglacera Infrastructure
           Investment Development Company
           +  Address: 12th Floor,  Viglacera Building, No. 1
           Thang Long Boulevard, Me Tri Ward, Nam Tu Liem
           District, Hanoi City.
           + Tel: +84 24 3553 7888; Fax: +84 24 3553 7166
           - Area: 182.42 ha
           - Characteristics: Non-polluting diversified
           industrial park includes industries of consumer
           goods production; textile; machine installation; exact
           mechanics; processing of agricultural and forest
           products; construction materials; Food Processing.

           II. Regional location and relations:
           - Distance from Hanoi center: About 310 km
           - Distance from center of Ha Long city, Quang Ninh province: About 150 km

           - Distance from Mong Cai International Border Gate: About 06 km
           - Road: Located on National Route No. 18, linking Hanoi – Quang Ninh (Vietnam) – Guangxi (China).
           - Seaport:
           + About 30km from Hai Ha seaport (Hai Ha district) (Under planned shipload receipt: 30,000-80,000 DWT;
           Capacity: 30-45 million tons/year).
           + About 50km from Fangchenggang (Guangxi – China).
           - Airport:
           + About 270 km from Noi Bai airport (Hanoi).
           + About 80 km from Van Don airport (Quang Ninh).
           - Railway: About 170 km from Ha Long station (Ha Long city).
           III Technical infrastructure
           - Internal transport: Being designed in form of squares to facilitate the categorization of function areas within
           the Industrial Park, conveninent for development of land plots. The main road of the Industrial Park is 33m wide;
           the ring road inside the Industrial Park is 11.25m wide; Industrial park’s branch roads are from 7-7.5m wide.
           - Power supply: 01 substation 110/22KV-2x63MVA in the technical infrastructure zone HTKT-1 and 01 substation
           110/22KV-25MVA inthe technical infrastructure zone HTKT-2