7. Primary technical infrastructure priorities to be
           finished by 2020: Bac Luan II Bridge access road system;
           road linking Quang Ha town with Hai Ha Seaport –
           Industrial Park; Hai Ha port (phase I), upgrade of Van Gia Port
           to a capacity of 1,000,000 tons/year; upgrade, innovation of
           the the border belt route; construction of military ports in
           islands in an combination of economic development with
           national defense - security; Construction of the following
           works: Quat Dong Water plant with a capacity of 68,000 m3/
           day; Quang Minh water plant with a capacity of 10,000 m3/
           day; Cai Chien water supply station: 500 m3/day. Upgrade
           of Van Gia water supply plant up to the capacity of 1,000
           m3/day, upgrade of capacity for Hai Ha 1 and Hai Ha 2 water
           plants to a total capacity of 120,000 m3/day; Construction
           of Thermal power plant in Hai Ha with a capacity of 900
           MW (phase I); 220 KV power line and substation in Hai Ha
           (2x250) MW and Mong Cai (1x250) MW; construction of new
           110 KV substations in Bien Mau (2x63) MW, Hai Dong (2x40)
           MW. Construction of 22 KV underground power cable from
           Vinh Trung commune - Vinh Thuc Island to Cai Chien Island;
           Construction of 5 wastewater treatment plants in Mong Cai
           city with a total capacity of 64,000 m3/day; 22-ha Quang
           Nghia Solid  Waste  Treatment Complexin Quang Nghia
           commune; Mong Cai Park Cemetery with an area of 25 ha.
           8.Road: National Route No. 18 is the arterial road linking
           Mong Cai Border Gate Economic Zone with the provinces
           in Red River delta and Northern midland and mountainous
           region; Currently the Van Don – Mong Cai Highway is being
           constructed; About 200 km from Hanoi city (via the highway;
           About 140 km from Ha Long City (via the highway); About
           40 km from Bac Phong Sinh Border Gate, about 80 km from
           Hoanh Mo Border Gate; About 70km from Fangchenggang
           city (China).
           9. Seaport: By 2020  Van Gia port shall be upgraded to
           the capacity of 1,000,000 tons/year and there shall also be
           inland wharves for small vehicles in Dan Tien and along Ka
           Long River; About 40 km from Hai Ha seaport; About 140
           km from Cai Lan port (Ha Long, Quang Ninh).
           10. Airport: About 140km from Van Don airport (Quang
           Ninh); About 300 km from Noi Bai international airport
           (Hanoi); About 175 km from Cat Bi airport (Hai Phong).
           11. Railway: Studies are being carried out for the
           construction of new Ha Long – Mong Cai railroad,
           construction of a branch linking Long – Mong Cai railroad
           with Hai Ha seaport; construction of 03 main stations within
           the Economic Zone: Quang Ha, Mong Cai and the port
           terminal.