HAI HA SEAPORT INDUSTRIAL PARK
I. General information constructed with capacity of 30 - 45 million tons/year,
for anchorage of ships whose load is 80,000 DWT.
- Location: Within administrative boundaries of 05
communes: Quang Dien, Quang Phong, Phu Hai, - Airport: About 270 km from Noi Bai Airport (Hanoi);
Quang Trung and Cai Chien of Hai Ha district About 45 km from Van Don airport (Quang Ninh).
- Area: 4,988 ha - Railway: About 132 km from Ha Long stration (Ha
Long city).
- Characteristics: Being a multi-sector Industrial park,
including heavy and light industries such as: Thermal III. Technical infrastructure
power, mechanics, textiles and textile auxiliaries, etc.; - Internal transport: Primary roads inside the
Being the combined harbor, warehouse and seaport Industrial Park have a width of 42m; inter-regional
services zone; Being a developed industrial and roads have the largest width of 32m.
seaport area of a flexible character, with synchronous
investment, being convenient, safe for investors, in - Power supply: In the initial phase the province’s
harmony with the surrounding urban areas currently available 220KV, 110KV power lines are
being used; in the subsequent phase Hai Ha Thermal
II. Regional location and relations:
Power Plant with a capacity of 2,100 MW is being
- Distance from Hanoi center: About 250 km; About constructed to directly supply power to the industrial
120 km from center of Ha Long city, Quang Ninh park and to supply steam for textile production. 05
province; About 30 km from Mong Cai International intermediate substations are being constructed to
Border Gate and Bac Phong Sinh border gate. directly serve the plants within the industrial park.
- Road: Located closely to National Route No. 18, - Water supply: In the initial phase water sources
linking Hanoi – Quang Ninh (Vietnam) – Guangxi are taken from Ha Coi and Tai Chi rivers by damping
(China); located closely to Van Don – Mong Cai method; in long term water from Trang Vinh
highway (expected to be completed in 2020) and Tai Chi Reservoirs shall be used; Raw water
supply pipelines or conduits from the above-
- Seaport: About 70km from Fangcheng port
(Guangxi – China); Hai Ha general port is being mentioned sources to the industrial park are being
constructed. 02 water supply plants for the entire
Quang Ninh Economic Zone Authority